HRID1011267

反应详情

EQUATION

反应方程式

HRID 1011267 的结构方程式

AUXILIARIES

试剂、催化剂与溶剂

1

PROCEDURE

实验过程

To a 250-mL round bottom flasked is added 10% Pd/C (100 mg) and 1-isopentyl-4-(4-nitrophenyl)piperazine (1.0 g, 3.6 mmol). The flask is sealed with a septum, and flushed with a slow stream of N2. EtOH (30 mL) is then added via syringed into the flask. The flask is again flushed with N2 and then it is fitted with a balloon of hydrogen. An outlet needle is inserted through the septum and the flask is flushed with hydrogen before the outlet needle is removed. The resulting slurry is stirred vigorously under the H2 atmosphere at rt. After 24 h the yellow color of the solution dissipated and the hydrogen balloon is removed. The flask is flushed with nitrogen, DCM (10 mL) is added to the reaction mixture, and the resulting slurry stirred at rt for 1.5 h. The reaction is filtered through a filtration tube packed with a short column of Celite, the Celite washed with DCM (2×20 mL), and the combined filtrate evaporated to dryness on a rotary evaporator. The product is air dried for 48 h and then it is dried under vacuum for 2 h to provide crude 4-(4-isopentylpiperazin-1-yl)aniline (1.16 g, 120% recovery due to the incomplete removal of the solvent, >80% purity as determined by LC/MS analysis @ UV 254 nm detection). The crude product was used in the next step without further purification. LCMS-ESI (m/z): calcd for C15H25N3, 247; [M+H]+ found, 248.

WORKUP

后处理

  1. customThe flask is sealed with a septum
  2. customflushed with a slow stream of N2
  3. additionEtOH (30 mL) is then added
  4. customThe flask is again flushed with N2
  5. customit is fitted with a balloon of hydrogen
  6. customAn outlet needle is inserted through the septum
  7. customthe flask is flushed with hydrogen before the outlet needle
  8. customis removed
  9. customthe hydrogen balloon is removed
  10. customThe flask is flushed with nitrogen, DCM (10 mL)
  11. additionis added to the reaction mixture
  12. stirringthe resulting slurry stirred at rt for 1.5 h
  13. filtrationThe reaction is filtered through a filtration tube
  14. washthe Celite washed with DCM (2×20 mL)
  15. customthe combined filtrate evaporated to dryness on a rotary evaporator
  16. customdried for 48 h
  17. customit is dried under vacuum for 2 h