HRID2098444

反应详情

EQUATION

反应方程式

HRID 2098444 的结构方程式

CONDITIONS

反应条件

温度
500 °C

PROCEDURE

实验过程

The disproportionation reaction is carried out by first purging the guard columns and metathesis reactor with an approximately 100 mL/min flow of N2 at atmospheric pressure. The purged reactor and guard columns are then heated to 500° C. with continuing N2 flow for 1 hr. The guard columns and reactors are maintained at 500° C.; then approximately 100 mL/min of H2 gas at atmospheric pressure is added to the N2 purge, and maintained for 2 hrs. The reactor is then cooled to 200° C., and the guard columns cooled to 50° C., and the flow of N2 and 112 is reduced to 50 mL/min. After purification in the respective guard columns, liquefied renewable 2-butene is then introduced into the butene guard column at a rate of 0.10 g/min, and liquefied renewable ethylene is introduced into the ethylene guard column at a flow rate of 64.5 mL/min and a pressure of 3.5 MPa. The ethylene, 2-butene, and H2 (7.0 mL/min, 3.5 MPa) were then charged into the metathesis reactor (after preheating to 200° C.). The butene conversion rate obtained by subtracting the total amount of trans-2-butene, cis-2-butene and 1-butene contained in the outlet gas from the metathesis reactor is 71%. The propylene selectivity based on butene is 90%. Small amounts of propane, pentene and hexene are also produced.

WORKUP

后处理

  1. customThe disproportionation reaction
  2. customby first purging the guard columns and metathesis reactor with an approximately 100 mL/min flow of N2 at atmospheric pressure
  3. temperatureThe guard columns and reactors are maintained at 500° C.
  4. additionthen approximately 100 mL/min of H2 gas at atmospheric pressure is added to the N2
  5. custompurge
  6. temperaturemaintained for 2 hrs
  7. temperatureThe reactor is then cooled to 200° C.
  8. temperaturethe guard columns cooled to 50° C.
  9. customAfter purification in the respective guard columns
  10. additionis then introduced into the butene guard column at a rate of 0.10 g/min
  11. additionis introduced into the ethylene guard column at a flow rate of 64.5 mL/min
  12. additionThe ethylene, 2-butene, and H2 (7.0 mL/min, 3.5 MPa) were then charged into the metathesis reactor (after preheating to 200° C.)
  13. customThe butene conversion rate obtained