HRID2252025

反应详情

EQUATION

反应方程式

HRID 2252025 的结构方程式

AUXILIARIES

试剂、催化剂与溶剂

3

CONDITIONS

反应条件

温度
22.5 °C

PROCEDURE

实验过程

Under a nitrogen atmosphere, combine 1-isopropylsulfonyl-2-amino-6-iodo benzimidazole (400 g, 1.095 moles), bis(triphenylphosphine) palladium(II)acetate (32.8 g, 0.044 moles), and CuI (41.7 g, 0.219 moles), followed by DMSO (8.4 L) and triethylamine (317 g, 3.133 moles). Stir the resulting mixture at 20 to 25° C. for 15 minutes, followed by the addition of phenylacetylene (168 g, 1.645 moles) over 30 minutes giving a temperature rise to 34° C. Cool the reaction slowly to 20 to 25° C., and after 15 hours, quench an aliquot of the reaction into water and dilute with CH3CN for HPLC analysis. The HPLC chromatogram (Column:Zorbax SB-C8, 4.6×250 mm, 5 micron UV=218 nm, gradients acetonitrile/buffer) indicates complete consumption of the iodide with the production of two new less polar products (desired product and phenylacetylene dimer). Add water (4 L) to the reaction over 1 hour giving a temperature rise to 40° C., and a dark precipitate (mainly catalyst). Filter the reaction through a thin layer of Celite® (24 cm diameter) with no washing of the catalyst waste cake. Return the filtrate to the reactor and add an additional 4 L of water over 1 hour to give an ending temperature of 45° C., and a yellow slurry. Leave the mixture to cool overnight to 20 to 25° C. with stirring. Collect the solids by vacuum filtration, and wash with water (4 L). Dry the solids at 60° C. under vacuum to constant weight. Yield=319 g (86%) of light yellow granular solid. MS(ES+): m/z=340.2 (M+H)+

WORKUP

后处理

  1. customgiving a temperature rise to 34° C
  2. temperatureCool
  3. customthe reaction slowly to 20 to 25° C.
  4. waitafter 15 hours
  5. customquench
  6. customan aliquot of the reaction into water
  7. customconsumption of the iodide with the production of two new less polar products (desired product and phenylacetylene dimer)
  8. customAdd water (4 L) to the reaction over 1 hour
  9. customgiving a temperature rise to 40° C.
  10. filtrationFilter
  11. customthe reaction through a thin layer of Celite® (24 cm diameter) with
  12. washno washing of the catalyst waste cake
  13. additionadd an additional 4 L of water over 1 hour
  14. customto give an ending temperature of 45° C.
  15. customLeave the mixture
  16. temperatureto cool overnight to 20 to 25° C.
  17. stirringwith stirring
  18. customCollect the solids
  19. filtrationby vacuum filtration
  20. washwash with water (4 L)
  21. customDry the solids at 60° C. under vacuum to constant weight